{"id":4312,"date":"2018-09-05T13:21:07","date_gmt":"2018-09-05T13:21:07","guid":{"rendered":"https:\/\/www.aziza.com.ng\/read\/?p=4312"},"modified":"2024-11-10T11:29:25","modified_gmt":"2024-11-10T11:29:25","slug":"dpr-requirement-for-filling-station-nigeria","status":"publish","type":"post","link":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/","title":{"rendered":"DPR Requirement for Filling Station Nigeria"},"content":{"rendered":"<p>We will explain in details the Procedures and Conditions To <a href=\"http:\/\/www.aziza.com.ng\/dpr-permit-requirements\/\">Obtain DPR License(s)<\/a>\u00a0For The Construction And Operation Of Petrol Retailing Filling Station in Nigeria<\/p>\n<h2>Click for<a href=\"http:\/\/www.aziza.com.ng\/procedure-dpr-licenses-steps-to-start-petrol-station-in-nigeria\/\">\u00a0F<strong>ull Procedure, DPR Licenses &amp; Steps to Start Petrol Station in Nigeria<\/strong><\/a><\/h2>\n<p>This page is a continuation from above link<br \/>\n4. STORAGE AND LICENCE TO OPERATE A PETROL FILLING STATION IN NIGERIA<br \/>\nAfter ATC and the construction of the station during which it is mandatory to<br \/>\ninvite officer(s) of DPR to witness the burial and Pressure\/Leak test of the U\/G<br \/>\ntanks, an application for storage and sales licence to operate the station must be<br \/>\nobtained.<\/p>\n<h2><strong><a href=\"http:\/\/www.aziza.com.ng\/procedure-dpr-licenses-steps-to-start-petrol-station-in-nigeria\/\">Procedure, DPR Licenses &amp; Steps to Start Petrol Station in Nigeria<\/a><\/strong><\/h2>\n<p><strong>THE REQUIREMENTS FOR STORAGE AND LICENCE TO OPERATE A PETROL FILLING STATION:<\/strong><br \/>\nThe following conditions must be met before storage and sales licence can be granted.<br \/>\n(i) A minimum of three (3) underground storage tanks (one each for PMS, DPK, and AGO.)<br \/>\n(ii) A minimum of three (3) dispensing pumps(one each for PMS,DPK and AGO)<br \/>\n(iii) Office building: Two (2) offices, sales room, toilet, lube bay\/store (Optional).<br \/>\n(iv) Well concreted forecourt \u201cIN\/OUT\u201d drive way inclusive.<br \/>\n(v) Wall fence demarcating the station (minimum height of 1.5m high).<br \/>\n(vi) Good drainage Network.<br \/>\n(vii) Safety facilities (Fire Extinguishers, Sand Buckets, strategic display of \u201cNO SMOKING\u201d warning signs.<br \/>\n(viii) Station Sign post\/logo of company\/outlet.<br \/>\n(ix) Standard canopy over PMS pumps (mandatory) with company name and logo boldly written.<br \/>\n(x) Standby Generator.<br \/>\n(xi) Accessible Potable water source.<br \/>\n(xii) Standard (51\u201d x 30\u201d) price bill board with changeable price mechanism<\/p>\n<h1><a href=\"http:\/\/www.aziza.com.ng\/3-dpr-permit-categories\/\">Click for 3 Categories of DPR Permits<\/a><\/h1>\n<p>DOCUMENTS REQUIRED<br \/>\n(a) Products U\/G tanks pressure test report\/Certificate and Leak detection test (original printout).<br \/>\n(b) Photographs of the station 8\u201d X 10\u201d (not computer generated photographs (snapped from different angles such that in\/out driveways pumps and other facilities are clearly shown).<br \/>\n(c) Current Fire certificate.<br \/>\n(d) Application form with Bank draft attached (amount depends on storage capacity).<br \/>\n(e) Evidence of trained attendants.<br \/>\n(f) Application letter addressed to:<br \/>\n<strong>DPR The Operations Controller<\/strong><\/p>\n<p>TAKE-OVER OF PETROL STATION<br \/>\nThe above requirements and documents are also applicable for a takeover station in addition to the following:-<\/p>\n<p>DOCUMENTS REQUIRED FOR TAKE-OVER OF STATIONS<br \/>\n(i) Two (2) photocopies of certificate of Incorporation<br \/>\n(ii) Two (2) photocopies of Memorandum &amp; Article of Association<br \/>\n(iii) Two (2) photocopies of Current tax clearance<br \/>\n(iv) Original and photocopy of Current Fire Service report and certificate<br \/>\n(v) Two (2) original copies of approved building plan.<br \/>\n(vi) Original copy of previous storage and sales licence<br \/>\n(vii) Pressure test certificate\/report &amp; Leak detection print out (original &amp;<br \/>\nphotocopy).<br \/>\n(viii) Evidence of trained pump attendants (original &amp; photocopy).<br \/>\n(ix) Completed application form with Bank draft depending on the total<br \/>\nstorage capacity applied for<br \/>\n(x) Receipt of purchase (if it is an outright purchase, Management agreement)<br \/>\n(xi) Release\/Takeover letter on company\u2019s letter headed paper<br \/>\n(xii) Station\u2019s photographs taken from different angles showing the followings:<br \/>\n(a) Station\u2019s name<br \/>\n(b) A fire extinguishers &amp; a sand bucket on each dispensing pump island<br \/>\n(c) Price bill board measuring 51\u201d by 30\u201d with fonts size 6\u201d by 3\u201d<br \/>\n(d) Clearly demarcated drive IN\/OUT Ways<br \/>\n(e) \u201cNO SMOKING\u201d signs conspicuously displayed in the station.<\/p>\n<p><strong>5. REQUIREMENTS TO OPERATE A PETROL FILLING STATION<\/strong><br \/>\nIn addition to the major requirements on the \u201cApproval to Operate Filling Station\u201d issued along with the maiden licence of a station, the following are also mandatory:-<br \/>\n(i) Functional Fire fighting gadgets must be kept handy and at alert.<br \/>\n(ii) Ensure that a station Manager\/Supervisor is always at the station<br \/>\n(iii) Always make available alternative source of power to operate products pumps and adequate illumination of the station.<br \/>\n(iv) Products are sold at prevailing government approved price<br \/>\n(v) Products pumps accurate dispense\/display of volume and price<br \/>\n(vi) Pump attendants trained and dressed in safety wears<br \/>\n(vii) Ensure that vehicle engines are switched off before fueling<br \/>\n(viii) Strategic and conspicuous display of warning signs on \u201cNO SMOKING and NO USE OF CELLPHONE\u201d within the station<br \/>\n(ix) Stations always maintain good house keeping.<br \/>\n(x) Tanker trucks are earthed before starting and throughout products discharge<br \/>\n(xi) Copy of each way-bill for products on sale shall have to be available at the station at all times.<br \/>\n(xii) Products in tanker trucks to be discharged into storage tanks shall have to be allowed to settle for at least two (2) hours while in the station before the discharge.<br \/>\n(xiii) Display of Current Storage and Sales licence in the station\u2019s office<br \/>\n(xiv) Availability of DPR inspections log book in the station<br \/>\n(xv) Unrestricted access to DPR officials to carry out statutory functions in the station.<\/p>\n<p>&nbsp;<\/p>\n<h2><span style=\"color: #0000ff;\">For help and other assistance, <strong><span style=\"color: #000000;\">click<\/span><\/strong> <a href=\"http:\/\/www.aziza.com.ng\/contact-us\/\">contact us<\/a>:<br \/>\n<\/span>or call\u00a0<span style=\"color: #0000ff;\"><strong>Mobile: +234 8033 185 898<\/strong><\/span><\/h2>\n<hr \/>\n<p>Application look like below:<\/p>\n<p>DEPARTMENT OF PETROLEUM RESOURCES (DPR) APPLICATION FOR STORAGE\/SALES LICENCE ONLY<br \/>\nSECTION A:<br \/>\n1. Name of Applicant\/Company: \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026..\u2026<br \/>\n2. Registered Address in Nigeria: \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026<br \/>\n3. Location Address for the storage of product(s): \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026..\u2026\u2026.<br \/>\n(a) Town and Street Number\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026.<br \/>\n(b) State: \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026. Local Govt. Area: \u2026\u2026\u2026\u2026..\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026<br \/>\n4. Type of licence required: Please TICK ONLY ONE (a, b, c ord)<br \/>\na. Industrial Consumer (Storage only) (Category I)<br \/>\nb. Petrol Station, Petroleum Products Depot (Category II)<br \/>\nc. Kerosene (House-Hold) (Category III)<br \/>\nd. Liquefied Petroleum Gas (Cooking Gas) (Category IV)<br \/>\n5. State whether application is for a NEW Licence or RENEWAL Licence, and the<br \/>\ncorresponding year(s) the licence is required: \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026.<br \/>\nIf RENEWAL, please attach photocopy of the expiring license<br \/>\nIf NEW, attach photocopy of approval letter from the DPR (Ref.SEC.A:4; a,b &amp;d)<br \/>\n6. Storage Capacity:<br \/>\nLPG (Cooking Gas) \u2026\u2026\u2026\u2026\u2026 (Kg) AGO (Diesel)\u2026\u2026\u2026\u2026\u2026\u2026 (Litres)<br \/>\nPMS (Petrol)\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026 (Litres) Fuel Oil \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026 (Litres)<br \/>\nLube Oil\/Grease \u2026\u2026\u2026\u2026\u2026\u2026 (Lit\/kg) Kerosene: \u2026\u2026\u2026\u2026\u2026\u2026\u2026 (Litres)<br \/>\nOTHERS \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026(Lit\/Kg) Kerosene: \u2026\u2026\u2026\u2026\u2026.\u2026\u2026. (Tin)<br \/>\n7. Type of Receptacle\/Storage: (TICK AS APPLICABLE)<br \/>\n(i) Underground Tank (ii) Drums (iii) Cylinder<br \/>\n(iv) Surface Tank (v) Tins (vi) Carton-packed<br \/>\n8. Has the Petroleum Station\u2019s Draft Management Agreement been verified or<br \/>\nendorsed by the DPR? YES\/NO or Not Applicable<br \/>\n9. Fee Paid (\u2026\u2026\u2026\u2026\u2026\u2026\u2026)\/Words \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026.<br \/>\nBank draft No \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026 Date \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026.<br \/>\nI\/We hereby certify that all the information contained in this application and supporting documents are to the best of my\/our knowledge, correct.<\/p>\n<p>\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026 \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026.. \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026..<br \/>\nName Signature Date<\/p>\n<p>SECTION B:<br \/>\n10. TO BE COMPLETED BY THE SPONSORING MARKETING COMPANY ONLY<br \/>\nName of Sponsoring Marketing Company: \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026<br \/>\nINDEPENDENT MARKETER\u2019S NUMBER (If applicable)\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026<br \/>\nNOTE<br \/>\na. Where an applicant obtains product(s) from more than one company, applications should<br \/>\nbe channeled through ONLY ONE Company.<br \/>\nb. Application not properly filled will be rejected and fees in respect of such rejected<br \/>\napplication will neither be refunded nor transferred on to any other application<br \/>\nc. An application must be submitted in respect of only ONE Category (See Item No.4<br \/>\nSection A)<br \/>\nd. Bank Draft (MICRO-DRAFT) to be made payable to the: \u201cFEDERAL<br \/>\nGOVERNMENT OF NIGERIA \/ DPR Fees Account\u201d. (DO NOT write \u201cFGN\u201d please).<br \/>\ne. Whereas Pressure Test Certificate and Report are required ensure that duly signed<br \/>\nORIGINAL CERTIFICATE are forwarded to LAGOS through respective zonal<br \/>\noffice of the DEPARTMENT OF PETROLEUM RESOURCES (DPR).<br \/>\nWe hereby UNDERTAKE to sponsor this application for the grant of license to store and\/or<br \/>\nsell petroleum products in accordance with the conditions prescribed in the \u201cPetroleum<br \/>\nRegulations 1969\u201d. (Petroleum Decree 1969).<br \/>\n\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026.. \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026..<br \/>\nName &amp; Signature of Authorising Company\u2019s Official Stamp &amp; Date<br \/>\nCompany Official<\/p>\n<p>SECTION C:<br \/>\nA. Bank Draft reference No \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026 Amount Paid (N\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026.)<br \/>\n\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026 \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026.\u2026\u2026\u2026\u2026 \u2026\u2026\u2026\u2026\u2026..<br \/>\nReceipt Number Name &amp; Signature of Receiving Officer Date &amp; Stamp<br \/>\nB. Recommendation of DPR Officer \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026.<br \/>\nC. Licence Number \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026 Date \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026<br \/>\n\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026 \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026 \u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026\u2026..<br \/>\nSignature &amp; Name of DPR Officer Station Date<\/p>\n<p>Source: DEPARTMENT OF PETROLEUM RESOURCES<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We will explain in details the Procedures and Conditions To Obtain DPR License(s)\u00a0For The Construction And Operation Of Petrol Retailing Filling Station in Nigeria Click for\u00a0Full Procedure, DPR Licenses &amp; Steps to Start Petrol Station in Nigeria This page is a continuation from above link 4. STORAGE AND LICENCE TO OPERATE A PETROL FILLING STATION [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4336,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-4312","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.5 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>DPR Requirement for Filling Station Nigeria - Aziza Goodnews<\/title>\n<meta name=\"description\" content=\"Procedures and Conditions To Obtain DPR License(s)\u00a0For The Construction And Operation Of Petrol Retailing Filling Station in Nigeria\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"DPR Requirement for Filling Station Nigeria\" \/>\n<meta property=\"og:description\" content=\"Procedures and Conditions To Obtain DPR License(s)\u00a0For The Construction And Operation Of Petrol Retailing Filling Station in Nigeria\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/\" \/>\n<meta property=\"og:site_name\" content=\"Aziza Goodnews\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/web.facebook.com\/azizaNigeria\" \/>\n<meta property=\"article:published_time\" content=\"2018-09-05T13:21:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-10T11:29:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.aziza.com.ng\/read\/wp-content\/uploads\/2018\/09\/DPR-permit-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1107\" \/>\n\t<meta property=\"og:image:height\" content=\"851\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Aziza Nigeria\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Aziza Nigeria\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/\"},\"author\":{\"name\":\"Aziza Nigeria\",\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/#\\\/schema\\\/person\\\/a29bc9acbb64b1e017ed494d99d5459d\"},\"headline\":\"DPR Requirement for Filling Station Nigeria\",\"datePublished\":\"2018-09-05T13:21:07+00:00\",\"dateModified\":\"2024-11-10T11:29:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/\"},\"wordCount\":1246,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/DPR-permit-2.jpg\",\"articleSection\":[\"Business\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/\",\"url\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/\",\"name\":\"DPR Requirement for Filling Station Nigeria - Aziza Goodnews\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/DPR-permit-2.jpg\",\"datePublished\":\"2018-09-05T13:21:07+00:00\",\"dateModified\":\"2024-11-10T11:29:25+00:00\",\"description\":\"Procedures and Conditions To Obtain DPR License(s)\u00a0For The Construction And Operation Of Petrol Retailing Filling Station in Nigeria\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/DPR-permit-2.jpg\",\"contentUrl\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/DPR-permit-2.jpg\",\"width\":1107,\"height\":851,\"caption\":\"DPR PERMITs\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/dpr-requirement-for-filling-station-nigeria\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"DPR Requirement for Filling Station Nigeria\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/#website\",\"url\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/\",\"name\":\"Aziza Goodnews\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/#organization\"},\"alternateName\":\"Aziza Nigeria\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/#organization\",\"name\":\"Aziza Nigeria\",\"alternateName\":\"Aziza Goodnews\",\"url\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/cropped-logo.png\",\"width\":512,\"height\":512,\"caption\":\"Aziza Nigeria\"},\"image\":{\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/web.facebook.com\\\/azizaNigeria\"],\"email\":\"contact@aziza.com.ng\",\"telephone\":\"+234 811 611 2326\",\"legalName\":\"Aziza Nigeria\",\"foundingDate\":\"2011-02-01\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"1\",\"maxValue\":\"10\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.aziza.com.ng\\\/read\\\/#\\\/schema\\\/person\\\/a29bc9acbb64b1e017ed494d99d5459d\",\"name\":\"Aziza Nigeria\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/df3c3583d4277d0c2d2ff252092f9f45c5bb7a8d1f622a69c1afbdb1e59efc31?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/df3c3583d4277d0c2d2ff252092f9f45c5bb7a8d1f622a69c1afbdb1e59efc31?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/df3c3583d4277d0c2d2ff252092f9f45c5bb7a8d1f622a69c1afbdb1e59efc31?s=96&d=mm&r=g\",\"caption\":\"Aziza Nigeria\"},\"sameAs\":[\"https:\\\/\\\/www.aziza.com.ng\\\/read\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"DPR Requirement for Filling Station Nigeria - Aziza Goodnews","description":"Procedures and Conditions To Obtain DPR License(s)\u00a0For The Construction And Operation Of Petrol Retailing Filling Station in Nigeria","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/","og_locale":"en_US","og_type":"article","og_title":"DPR Requirement for Filling Station Nigeria","og_description":"Procedures and Conditions To Obtain DPR License(s)\u00a0For The Construction And Operation Of Petrol Retailing Filling Station in Nigeria","og_url":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/","og_site_name":"Aziza Goodnews","article_publisher":"https:\/\/web.facebook.com\/azizaNigeria","article_published_time":"2018-09-05T13:21:07+00:00","article_modified_time":"2024-11-10T11:29:25+00:00","og_image":[{"width":1107,"height":851,"url":"https:\/\/www.aziza.com.ng\/read\/wp-content\/uploads\/2018\/09\/DPR-permit-2.jpg","type":"image\/jpeg"}],"author":"Aziza Nigeria","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Aziza Nigeria","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/#article","isPartOf":{"@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/"},"author":{"name":"Aziza Nigeria","@id":"https:\/\/www.aziza.com.ng\/read\/#\/schema\/person\/a29bc9acbb64b1e017ed494d99d5459d"},"headline":"DPR Requirement for Filling Station Nigeria","datePublished":"2018-09-05T13:21:07+00:00","dateModified":"2024-11-10T11:29:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/"},"wordCount":1246,"commentCount":0,"publisher":{"@id":"https:\/\/www.aziza.com.ng\/read\/#organization"},"image":{"@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/#primaryimage"},"thumbnailUrl":"https:\/\/www.aziza.com.ng\/read\/wp-content\/uploads\/2018\/09\/DPR-permit-2.jpg","articleSection":["Business"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/","url":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/","name":"DPR Requirement for Filling Station Nigeria - Aziza Goodnews","isPartOf":{"@id":"https:\/\/www.aziza.com.ng\/read\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/#primaryimage"},"image":{"@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/#primaryimage"},"thumbnailUrl":"https:\/\/www.aziza.com.ng\/read\/wp-content\/uploads\/2018\/09\/DPR-permit-2.jpg","datePublished":"2018-09-05T13:21:07+00:00","dateModified":"2024-11-10T11:29:25+00:00","description":"Procedures and Conditions To Obtain DPR License(s)\u00a0For The Construction And Operation Of Petrol Retailing Filling Station in Nigeria","breadcrumb":{"@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/#primaryimage","url":"https:\/\/www.aziza.com.ng\/read\/wp-content\/uploads\/2018\/09\/DPR-permit-2.jpg","contentUrl":"https:\/\/www.aziza.com.ng\/read\/wp-content\/uploads\/2018\/09\/DPR-permit-2.jpg","width":1107,"height":851,"caption":"DPR PERMITs"},{"@type":"BreadcrumbList","@id":"https:\/\/www.aziza.com.ng\/read\/dpr-requirement-for-filling-station-nigeria\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.aziza.com.ng\/read\/"},{"@type":"ListItem","position":2,"name":"DPR Requirement for Filling Station Nigeria"}]},{"@type":"WebSite","@id":"https:\/\/www.aziza.com.ng\/read\/#website","url":"https:\/\/www.aziza.com.ng\/read\/","name":"Aziza Goodnews","description":"","publisher":{"@id":"https:\/\/www.aziza.com.ng\/read\/#organization"},"alternateName":"Aziza Nigeria","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.aziza.com.ng\/read\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.aziza.com.ng\/read\/#organization","name":"Aziza Nigeria","alternateName":"Aziza Goodnews","url":"https:\/\/www.aziza.com.ng\/read\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.aziza.com.ng\/read\/#\/schema\/logo\/image\/","url":"https:\/\/www.aziza.com.ng\/read\/wp-content\/uploads\/2024\/10\/cropped-logo.png","contentUrl":"https:\/\/www.aziza.com.ng\/read\/wp-content\/uploads\/2024\/10\/cropped-logo.png","width":512,"height":512,"caption":"Aziza Nigeria"},"image":{"@id":"https:\/\/www.aziza.com.ng\/read\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/web.facebook.com\/azizaNigeria"],"email":"contact@aziza.com.ng","telephone":"+234 811 611 2326","legalName":"Aziza Nigeria","foundingDate":"2011-02-01","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"1","maxValue":"10"}},{"@type":"Person","@id":"https:\/\/www.aziza.com.ng\/read\/#\/schema\/person\/a29bc9acbb64b1e017ed494d99d5459d","name":"Aziza Nigeria","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/df3c3583d4277d0c2d2ff252092f9f45c5bb7a8d1f622a69c1afbdb1e59efc31?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/df3c3583d4277d0c2d2ff252092f9f45c5bb7a8d1f622a69c1afbdb1e59efc31?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/df3c3583d4277d0c2d2ff252092f9f45c5bb7a8d1f622a69c1afbdb1e59efc31?s=96&d=mm&r=g","caption":"Aziza Nigeria"},"sameAs":["https:\/\/www.aziza.com.ng\/read"]}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/posts\/4312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/comments?post=4312"}],"version-history":[{"count":0,"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/posts\/4312\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/media\/4336"}],"wp:attachment":[{"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/media?parent=4312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/categories?post=4312"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aziza.com.ng\/read\/wp-json\/wp\/v2\/tags?post=4312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}